The following features are either \planned{planned}, \inprogress{under construction} or \done{done}: \begin{itemize} \item \done{Reading from an input file as described in section~\ref{sec:inputFileFormat}.} \item \inprogress{Drawing a graph with specified node sizes and positions.} \item \planned{Running the BK node placement algorithm.}\TODO{cite and refer to in introduction} \item \planned{Illustrating the progress of the BK node placement algorithm while it is running.} \item \planned{Running the algorithm step by step manually (by pushing a button labeled \enquote{Step}).} \item \planned{Running the algorithm step by step with configurable delay.} \item \planned{Configuring the verbosity of the animation.} \end{itemize}